Case Studies

Auraria Higher Education Center

Our team provided equipment coordination and scheduling assistance.

View Case Study

Colorado Rockies Coors Field

We installed a temporary boiler system to keep the stadium warm while work on the new system was completed.

View Case Study

Denver International Airport Great Hall

BIM coordination and clash detection helped ensure that building utilities could be installed smoothly, with no overlap or collisions.

View Case Study

Denver Public Schools Hallett Academy

Our team worked during off-hours and school breaks to help ensure that normal operations were not interrupted by the project.

View Case Study

Intermountain Health Hospital

Our fabrication team contributed to this project’s success, building bathroom pods for the patient room wings.

View Case Study

University of Colorado Health Anschutz Operating Rooms

Previous experience at this medical campus improved labor efficiency and improved coordination with fellow trade contractors.

View Case Study

University of Colorado Health Anschutz Tower 3

Off-site assembly construction and “just in time” deliveries helped us reduce site traffic and storage needs on this tight site footprint.

View Case Study